Back to the stormwater review queue
Stormwater facility inspection: Crossroads Taqueria
ApprovedFiled Dec 24, 2025 by Drew Harlow, Evergreen Engineering. Filed from a phone.
Report
- Date of service
- Dec 24, 2025
- Facility type
- Dry pond
- Sediment accumulation
- 67 % of capacity
- Inlet and outlet clear
- No
- Erosion or embankment damage
- No
- Vegetation maintained
- No
- Maintenance needed
- Remove sediment at forebay; clear outlet trash rack
- Functioning as designed
- No
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Drew Harlow, current on the service date
- All required fields present
- Address matches parcel 073-70-01208
- Sediment over 50% of capacity: cleanout needed.
- Blocked inlet or outlet.
- Result: needs follow-up. The property stays on the overdue list until a passing report arrives.
Decision
Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.
Property
3053 Mill Creek Way
Owner: Whitcomb Holdings LLC
Parcel 073-70-01208