Back to the backflow review queue

Backflow assembly test: Blue Heron Animal Hospital

Approved

Filed Jun 24, 2024 by Jordan Wexler, Summit Plumbing & Backflow. Read in from a paper form and confirmed by staff.

Report

Date of service
Jun 24, 2024
Assembly type
RP
Serial number
Z731217
Size
4
Test gauge serial
G-1227
Gauge calibration date
Dec 21, 2023
Check valve 1
6.2 psid
Check valve 1 closed tight
Yes
Check valve 2
2.8 psid
Relief valve opened at
3.1 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Jordan Wexler, current on the service date
  • All required fields present
  • Address matches parcel 075-90-01242
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.

Property

1633 Spring Branch Trl
Owner: Benton Holdings LLC
Parcel 075-90-01242