Back to the backflow review queue

Backflow assembly test: 7289 Orchard Way

Approved

Filed Jul 15, 2024 by Jordan Wexler, Summit Plumbing & Backflow. Filed from a phone.

Report

Date of service
Jul 15, 2024
Assembly type
DC
Serial number
B834563
Size
1
Test gauge serial
G-6258
Gauge calibration date
Jun 12, 2024
Check valve 1
4.8 psid
Check valve 1 closed tight
Yes
Check valve 2
1 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Jordan Wexler, current on the service date
  • All required fields present
  • Address matches parcel 075-56-01095
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.

Property

7289 Orchard Way
Owner: Hayden Vance
Parcel 075-56-01095