Back to the backflow review queue

Backflow assembly test: 3429 Cedar Hollow Dr

Approved

Filed Apr 20, 2026 by Quinn Stroud, Patriot Plumbing & Backflow. Filed from a phone.

Report

Date of service
Apr 20, 2026
Assembly type
PVB
Serial number
B748858
Size
1
Test gauge serial
G-9547
Gauge calibration date
Feb 14, 2026
Check valve 1
4.7 psid
Check valve 1 closed tight
Yes
Check valve 2
3.2 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Quinn Stroud, current on the service date
  • All required fields present
  • Address matches parcel 075-60-01157
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.

Property

3429 Cedar Hollow Dr
Owner: Avery Wexler
Parcel 075-60-01157