Back to the backflow review queue
Backflow assembly test: 1152 Ridgeview Trl
ApprovedFiled Jul 20, 2025 by Blake Hollins, Keystone Backflow Testing. Read in from a paper form and confirmed by staff.
Report
- Date of service
- Jul 20, 2025
- Assembly type
- PVB
- Serial number
- Z401380
- Size
- 1
- Test gauge serial
- G-4220
- Gauge calibration date
- May 16, 2025
- Check valve 1
- 4.4 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 1.8 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Blake Hollins, current on the service date
- All required fields present
- Address matches parcel 077-34-01008
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.
Property
1152 Ridgeview Trl
Owner: Riley Ramirez
Parcel 077-34-01008