Back to the backflow review queue
Backflow assembly test: 2402 Fox Run Dr
ApprovedFiled Nov 18, 2025 by Parker Okafor, Summit Backflow Testing. Filed from a phone.
Report
- Date of service
- Nov 18, 2025
- Assembly type
- DC
- Serial number
- B352771
- Size
- 1
- Test gauge serial
- G-8339
- Gauge calibration date
- Oct 11, 2024
- Check valve 1
- 0.1 psid
- Check valve 1 closed tight
- No
- Check valve 2
- 3.8 psid
- Result
- Fail
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Parker Okafor, current on the service date
- All required fields present
- Address matches parcel 079-58-01145
- Test gauge calibration is more than a year old.
- Result: needs follow-up. The property stays on the overdue list until a passing report arrives.
Decision
Approved by J. Staff. The property's next due date is set and the owner gets a receipt.
Property
2402 Fox Run Dr
Owner: Shawn Calloway
Parcel 079-58-01145