Back to the backflow review queue

Backflow assembly test: 2352 Pine Knoll Trl

Approved

Filed Aug 27, 2026 by Cameron Lindqvist, Northstar Plumbing & Backflow. Filed from a phone.

Report

Date of service
Aug 27, 2026
Assembly type
PVB
Serial number
Z707857
Size
1
Test gauge serial
G-9248
Gauge calibration date
Apr 4, 2026
Check valve 1
4.2 psid
Check valve 1 closed tight
Yes
Check valve 2
1.5 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Cameron Lindqvist, current on the service date
  • All required fields present
  • Address matches parcel 079-43-01331
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.

Property

2352 Pine Knoll Trl
Owner: Casey Brandt
Parcel 079-43-01331