Back to the septic review queue

Septic maintenance (pump-out): 4854 Sycamore Ln

Approved

Filed Dec 9, 2023 by Drew Wexler, Clearwater Wastewater. Filed from a phone.

Report

Date of service
Dec 9, 2023
Tank size
1250 gal
Compartments
1
Parts this system has
Septic tank, Pump tank and effluent pump, High-water alarm, Drainfield or mound
Gallons pumped
1260 gal
Sludge depth
15 in
Scum depth
5 in
Baffles in good condition
Yes
Effluent filter
Replaced
Lids and risers secure
Yes
Pump runs and the floats turn it on and off
Yes
Alarm tested and working
Yes
Drainfield or mound: no surfacing, soggy ground or odor
Yes
Disposal site
County treatment plant
Repair needed
No
Photos
2 attached
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Drew Wexler, current on the service date
  • All required fields present
  • Address matches parcel 083-38-01027
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.

Property

4854 Sycamore Ln
Owner: Logan Lindqvist
Parcel 083-38-01027