Back to the backflow review queue

Backflow assembly test: 5819 Pine Knoll Ct

Approved

Filed Dec 5, 2025 by Jordan Fairley, Keystone Backflow Testing. Read in from a paper form and confirmed by staff.

Report

Date of service
Dec 5, 2025
Assembly type
PVB
Serial number
Z985782
Size
3/4
Test gauge serial
G-9746
Gauge calibration date
Apr 23, 2025
Check valve 1
6.3 psid
Check valve 1 closed tight
Yes
Check valve 2
4 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Jordan Fairley, current on the service date
  • All required fields present
  • Address matches parcel 083-84-01078
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.

Property

5819 Pine Knoll Ct
Owner: Avery Fairley
Parcel 083-84-01078