Back to the septic review queue

Septic maintenance (pump-out): 8839 Old Church Ct

Approved

Filed Jun 25, 2025 by Parker Marsh, Clearwater Wastewater. Filed from a phone.

Report

Date of service
Jun 25, 2025
Tank size
1000 gal
Compartments
1
Parts this system has
Septic tank, Pump tank and effluent pump, High-water alarm, Drainfield or mound
Gallons pumped
965 gal
Sludge depth
28 in
Scum depth
5 in
Baffles in good condition
No
Effluent filter
Cleaned
Lids and risers secure
No
Pump runs and the floats turn it on and off
Yes
Alarm tested and working
Yes
Drainfield or mound: no surfacing, soggy ground or odor
Yes
Disposal site
County treatment plant
Repair needed
Yes
Repair needed: describe
Outlet baffle missing
Photos
None
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Parker Marsh, current on the service date
  • All required fields present
  • Address matches parcel 087-58-01018
  • Sludge is over a third of a typical tank depth; check for system failure.
  • Baffles reported damaged; county may require repair.
  • Unsecured lids are a safety hazard.
  • No photos attached.
  • Result: needs follow-up. The property stays on the overdue list until a passing report arrives.

Decision

Approved by J. Staff. The property's next due date is set and the owner gets a receipt.

Property

8839 Old Church Ct
Owner: Morgan Ramirez
Parcel 087-58-01018