Back to the backflow review queue
Backflow assembly test: 7136 Cedar Hollow Trl
ApprovedFiled Jun 5, 2026 by Quinn Ashby, Patriot Plumbing & Backflow. Filed from a phone.
Report
- Date of service
- Jun 5, 2026
- Assembly type
- PVB
- Serial number
- Z567150
- Size
- 3/4
- Test gauge serial
- G-1316
- Gauge calibration date
- Sep 22, 2025
- Check valve 1
- 5.4 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 3.5 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Quinn Ashby, current on the service date
- All required fields present
- Address matches parcel 095-79-01354
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved by J. Staff. The property's next due date is set and the owner gets a receipt.
Property
7136 Cedar Hollow Trl
Owner: Alex Wexler
Parcel 095-79-01354