Back to the backflow review queue

Backflow assembly test: 410 Pine Knoll Way

Approved

Filed Oct 9, 2025 by Quinn Ashby, Patriot Plumbing & Backflow. Filed from a phone.

Report

Date of service
Oct 9, 2025
Assembly type
RP
Serial number
Z506584
Size
3/4
Test gauge serial
G-4943
Gauge calibration date
Jun 14, 2025
Check valve 1
6.6 psid
Check valve 1 closed tight
Yes
Check valve 2
1.5 psid
Relief valve opened at
3.9 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Quinn Ashby, current on the service date
  • All required fields present
  • Address matches parcel 095-84-01184
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.

Property

410 Pine Knoll Way
Owner: Cameron Benton
Parcel 095-84-01184