Back to the backflow review queue
Backflow assembly test: Golden Medical Offices
ApprovedFiled May 18, 2024 by Rowan Danner, Keystone Backflow Testing. Filed from a phone.
Report
- Date of service
- May 18, 2024
- Assembly type
- DC
- Serial number
- K105063
- Size
- 4
- Test gauge serial
- G-2880
- Gauge calibration date
- May 2, 2023
- Check valve 1
- 0.4 psid
- Check valve 1 closed tight
- No
- Check valve 2
- 2.1 psid
- Result
- Fail
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Rowan Danner, current on the service date
- All required fields present
- Address matches parcel 095-48-01106
- Test gauge calibration is more than a year old.
- Result: needs follow-up. The property stays on the overdue list until a passing report arrives.
Decision
Approved by J. Staff. The property's next due date is set and the owner gets a receipt.
Property
5906 Sycamore Dr
Owner: Ashby Holdings LLC
Parcel 095-48-01106