Back to the backflow review queue
Backflow assembly test: 8423 Quarry Way
ApprovedFiled Oct 28, 2025 by Alex Kessler, Valley Plumbing & Backflow. Read in from a paper form and confirmed by staff.
Report
- Date of service
- Oct 28, 2025
- Assembly type
- DC
- Serial number
- K315274
- Size
- 3/4
- Test gauge serial
- G-7093
- Gauge calibration date
- Mar 18, 2025
- Check valve 1
- 6 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 1.7 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Alex Kessler, current on the service date
- All required fields present
- Address matches parcel 097-33-01302
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved by J. Staff. The property's next due date is set and the owner gets a receipt.
Property
8423 Quarry Way
Owner: Morgan Calloway
Parcel 097-33-01302