Back to the backflow review queue
Backflow assembly test: Station Medical Offices
ApprovedFiled Oct 7, 2026 by Alex Kessler, Valley Plumbing & Backflow. Filed from a phone.
Report
- Date of service
- Oct 7, 2026
- Assembly type
- RP
- Serial number
- K784805
- Size
- 2
- Test gauge serial
- G-1291
- Gauge calibration date
- Dec 15, 2025
- Check valve 1
- 4 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 3 psid
- Relief valve opened at
- 3.5 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Alex Kessler, current on the service date
- All required fields present
- Address matches parcel 097-41-01256
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.
Property
6774 Fox Run Way
Owner: Calloway Holdings LLC
Parcel 097-41-01256