Back to the backflow review queue

Backflow assembly test: Two Rivers Animal Hospital

Approved

Filed Jul 11, 2026 by Parker Vance, Summit Backflow Testing. Read in from a paper form and confirmed by staff.

Report

Date of service
Jul 11, 2026
Assembly type
RP
Serial number
A608878
Size
4
Test gauge serial
G-3494
Gauge calibration date
Nov 19, 2025
Check valve 1
9 psid
Check valve 1 closed tight
Yes
Check valve 2
3.6 psid
Relief valve opened at
3.4 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Parker Vance, current on the service date
  • All required fields present
  • Address matches parcel 107-14-01122
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.

Property

5165 Stone Gate Rd
Owner: Lindqvist Holdings LLC
Parcel 107-14-01122