Back to the backflow review queue

Backflow assembly test: 469 Stone Gate Way

Approved

Filed Sep 5, 2025 by Parker Fairley, Patriot Backflow Testing. Read in from a paper form and confirmed by staff.

Report

Date of service
Sep 5, 2025
Assembly type
RP
Serial number
W195367
Size
3/4
Test gauge serial
G-3393
Gauge calibration date
Nov 26, 2024
Check valve 1
7.8 psid
Check valve 1 closed tight
Yes
Check valve 2
1.3 psid
Relief valve opened at
3.5 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Parker Fairley, current on the service date
  • All required fields present
  • Address matches parcel 107-61-01215
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.

Property

469 Stone Gate Way
Owner: Blake Fairley
Parcel 107-61-01215