Back to the backflow review queue
Backflow assembly test: 7289 Laurel Ct
ApprovedFiled Apr 25, 2023 by Parker Fairley, Patriot Backflow Testing. Filed from a phone.
Report
- Date of service
- Apr 25, 2023
- Assembly type
- PVB
- Serial number
- W231490
- Size
- 1
- Test gauge serial
- G-6405
- Gauge calibration date
- Sep 12, 2022
- Check valve 1
- 7.9 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 2.3 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Parker Fairley, current on the service date
- All required fields present
- Address matches parcel 107-21-01213
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.
Property
7289 Laurel Ct
Owner: Alex Ellery
Parcel 107-21-01213