Back to the backflow review queue
Backflow assembly test: Main Street Taqueria
ApprovedFiled May 12, 2026 by Parker Vance, Summit Backflow Testing. Read in from a paper form and confirmed by staff.
Report
- Date of service
- May 12, 2026
- Assembly type
- DC
- Serial number
- A581414
- Size
- 1
- Test gauge serial
- G-8865
- Gauge calibration date
- Mar 24, 2026
- Check valve 1
- 4.7 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 1.5 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Parker Vance, current on the service date
- All required fields present
- Address matches parcel 107-21-01289
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.
Property
5034 Quarry Trl
Owner: Brandt Holdings LLC
Parcel 107-21-01289